
Sign In or Register to view pricing and more.
Documents & Guides
Milb U5310-o-75 100a Met Rt P, ****Customer must confirm local utility or metering/power distribution approval for the metering and power distribution equipment prior to installation. Seller makes no warranty of utility acceptance.****
Overview
Milb U5310-o-75 100a Met Rt P, ****Customer must confirm local utility or metering/power distribution approval for the metering and power distribution equipment prior to installation. Seller makes no warranty of utility acceptance.****
Also known as: 784572258556, U5310-O-75
Specifications
| Standards: | California Proposition 65 |
| Standards: | California Proposition 65 |